Monday, November 29, 2010

Behavioral Setting- inside view

This is a view of my behavioral setting project without the roof on. You can see how the second floor works with the rest of the house downstairs.

Sunday, November 7, 2010

Final Industrial Design

This is my finalized industrial design.  The joints worked well on all the areas, and it did not take too long to build. It turned out like my model and ended up being what I had had in mind.

Tuesday, November 2, 2010

Finalized Logo

This is my logo that I have decided on. I worked with the positive and negative spaces.